top of page
Untitled atm
Performance included mixing and pouring concrete into 3 24x24 inch paver out of found wood frames. After transporting bags of concrete and water through the sand, I mixed and poured the concrete into the molds. I then transported the broken concrete fragments, sand, and frames and installed them in a line and printed images which I installed on the gallery wall using 1.5 inch nails and hot glued the printed images to the nails so they were off the wall.
-
Examine methods -> consider the “opposite” -> process and “responding to what happens” and trusting my intuition.
-
Experiment with balance -> when the performance starts and ends ->whats documented/why ->whats edited
-
Thinking of this work as a process to next works more than an end product





Installation Images:



bottom of page